Skip to content

IFC plan optimization and design review

Understand IFC model exchange, reviewer-led plan changes, and the limits of design validation in Strategic Designer.

/ 01

What does IFC plan optimization mean?

IFC plan optimization means reviewing a building model against a project brief and proposing changes to its layout or design. Strategic Designer keeps options, reviewer feedback and approved deliverables with the project. A proposed improvement still needs human review; model exchange alone does not establish compliance, buildability or engineering accuracy.

IFC (Industry Foundation Classes) is an open format for exchanging building-model information. It is different from a picture of a plan or a spreadsheet of client requirements.

Review circulation, room relationships and the brief together. An option is a proposal, not a certified construction solution.

/ 02

How does an enterprise review and revise a plan?

An enterprise reviews the available design options, records observations and deliberately approves the option it wants to develop. Where a supported design handoff is configured, reviewers can request targeted revisions. Native authoring files are not interchangeable with IFC: edited models must be exported to the supported exchange format before handoff.

Reviewer feedback can address specific items in an option rather than silently replacing the approved design.

An ArchiCAD PLN file is not readable by the design agent. Export the reviewer-edited model as IFC. Remote execution depends on configured access and confirmed compatibility; this guide does not activate it.

  1. Check the project brief and available option files.
  2. Record observations and compare the options against the brief.
  3. For an edited authoring model, export IFC before the supported handoff.
  4. Review the resulting revision and explicitly approve the chosen option.
/ 03

What does validation prove?

Validation can check declared file formats, dossier structure and the relationship between model and accompanying design data. It does not prove that every quantity was extracted correctly, that a structure is safe or that local regulations are satisfied. Those decisions remain with qualified professionals and the enterprise’s separate review and approval process.

Keep proposal files distinct from final PDF, IFC and accompanying design data. A delivered file is not automatically an approved estimate.

Only share the customer-facing package selected for that purpose. Private technical files are not public documentation.